12/06/2023
Automatic People Mover Project at the King Abdulaziz International Airport, with the role of Team Leader. EGIS Rail acts as APM PMC and System consultant of General Authority of Civil Aviation, project owner. As PMC it was: • Cost control, approve payment certificate are consistent with the project progress; • Detail project schedule analyses and optimization, verification and report project progress, management of communications with main contractor, represent project owner in the activities related with APM, monitor the completion of the installation, Wayside Equipment, Technical Rooms • Interfaces and integration across other third-party systems and integration of APM System in Airport Operations. • Design approval, APM System functionalities and system requirements according contract, for Wayside APM Sub-System, Rolling Stock and Onboard Equipment, Signalling CBTC System(ATP+ATP+ATS), TWC – Train to Wayside Communication, Platform Screen Doors Systems, Data Transmission System, Public Address and Information, CCTV and Voice Sub-System, Power Distribution System of APM; • EMC Design. Safety Hazard Analyses and Safety Plan, Verification of Operation Schemes and degraded modes align with design; • Commissioning based on Test Procedures approval, installation verification inspections, witness Site Tests and Integrated Tests, as well integration of all sub-system to ensure that APM System functionalities and requirements are align with contract during the test phase. • Monitored and willingness System Demonstration Testing, Validation and Verification activities. Verifies Independent Safety Assessment (ISA) Statements, Check from the contractor the System Certification Process for go into operation unrestricted passenger service. Check Prerequisites for Achieving Final Approval.